Progress report for RA1.1 Bioreactors and automation | 29/09/2021 | TCP-FN007 | |
High level experimental workflow for the study of in vitro adventitious rooting of Pinus radiata micro-shoots | 29/09/2021 | TCP-FN008 | |
Progress report for RA1.3 Ex vitro growth | 29/09/2021 | TCP-FN009 | |
Survey design to measure acceptability of tissue culture technologies among the New Zealand general public | 29/09/2021 | TCP-FN010 | |
Progress report for RA1.1 Bioreactors and automated systems | 29/09/2021 | TCP-FN011 | |
High level experimental workflow for the maturation of embryogenic cell lines of Pinus radiata in temporary immersion bioreactors | 29/09/2021 | TCP-FN012 | |
Progress report for RA1.3 Ex vitro growth | 29/09/2021 | TCP-FN013 | |
High level experimental workflow for testing the effects of LED lights on germination of Pinus radiata somatic embryos | 29/09/2021 | TCP-FN014 | |
Design of imaging system compatible with TIM bioreactors (prototype system), enabling long-term imaging of living tissues. | 29/09/2021 | TCP-FN015 | |
Updated SOP for the set-up and handling of temporary immersion bioreactors | 19/03/2022 | TCP-FN016 | |
Conceptual design of first-generation experimental customized TIM bioreactors with gas phase control (customized 1st GEN bioreactor) at GT | 29/09/2021 | TCP-T001 | TCP-T001 _G10 (610.52 Kb) |
Extraction section of the Experimental Fluidics System | 29/09/2021 | TCP-T002 | TCP-T002 _G10 (475.68 Kb) |
Installation and technical performance of Temporary immersion bioreactors system at Scion | 29/09/2021 | TCP-T003 | TCP-T003 (1.86 Mb) |
Micro-plug systems for micro-shoots and emblings of Pinus radiata – Experiment 1 | 29/09/2021 | TCP-T004 | TCP-T004 (1.07 Mb) |
Forest Growers’ and Nursery Operator’s Perceptions of the Proposed TC21 Technologies | 29/09/2021 | TCP-T005 | TCP-T005 (373.93 Kb) |
Technical Report with SE fluidics system design – Georgia Tech | 29/09/2021 | TCP-T006 | TCP-T006 (1.12 Mb) |
Mini-plug systems for ex vitro rooting of Pinus radiata micro-shoots | 29/09/2021 | TCP-T007 | TCP-T007 (1022.94 Kb) |
Micropropagation of Pinus radiata: Current protocols used at Scion | 01/10/2021 | TCP-T008 | TCP-T008 (5.43 Mb) |
Progress of 1st GEN Bioreactors | 01/12/2021 | TCP-T009 | TCP-T009 (2.59 Mb) |
Progress with SE Fluidics system | 01/12/2021 | TCP-T010 | TCP-T010 (1.11 Mb) |
Reducing the germination period, with and without a cool storage option, of Pinus radiata (Scion) and Pinus sylvestris (LUKE) somatic embryos | 01/03/2022 | TCP-T011 | TCP-T011 (2.26 Mb) |
Safety-link Multi-monitor Emergency Alarm Systems | 01/01/1993 | TN-08 | web_TN-8 (351.41 Kb) |
Bracke B290 Spot Scarifier Mounder | 01/01/1995 | TN-17 | web_TN-17 (353.45 Kb) |
Effects of the VH-Mulcher on Early Tree Growth | 01/01/2000 | TN-54 | web_TN-54 (324.18 Kb) |
PFV Wire Rope | 20/06/2017 | TN-V4-1 | web_TN-V4-1 (256.67 Kb) |
Short-Pulp Extraction with a Smaller Hauler | 01/01/1979 | TR-V-01-03 | web_TN-V1-3 (327.82 Kb) |
A New Cable Log Concept for Thinning | 01/01/1979 | TR-V-01-04 | web_TN-V10-4 (1.34 Mb) |
Thinning Systems in Sweden | 01/01/1979 | TR-V-01-06 | web_TN-V1-6 (328.65 Kb) |
Helicopter Logging Trial in Second Crop Kauri Forest | 01/01/1980 | TR-V-02-02 | web_TN-V2-2 (878.17 Kb) |
Chainsaw Testing and Selection | 01/01/1980 | TR-V-02-03 | web_TN-V2-3 (941.04 Kb) |
Selective Logging Trial of FMC in Indigenous Forest | 01/01/1980 | TR-V-02-04 | web_TN-V2-4 (873.08 Kb) |
Wire Rope Splicing Methods | 01/01/1981 | TR-V-03-02 | web_TN-V3-2 (784.22 Kb) |
Hitachi Feller Buncher Trial | 01/01/1981 | TR-V-03-03 | web_TN-V3-3 (759.10 Kb) |
The Christy Hauler and Carriage | 01/01/1984 | TR-V-05-01 | web_TN-V5-1 (219.67 Kb) |
Spyder Steep-Slope Feller-Buncher | 01/01/1983 | TR-V-05-02 | web_TN-V5-2 (861.01 Kb) |
Log Processor and Stacker | 01/01/1983 | TR-V-05-05 | web_TN-V5-5 (752.62 Kb) |
The Development of Commercial CNG Diesel Dual Fuel Systems | 01/01/1983 | TR-V-05-06 | web_TN-V5-6 (293.60 Kb) |
Regular 91 Petrol- Will it Effect Chainsaws? | 01/01/1984 | TR-V-05-08 | web_TN-V5-8 (203.41 Kb) |
Clydesdale Logging | 01/01/1984 | TR-V-06-02 | web_TN-V6-2 (1.09 Mb) |
Weight/Volume Conversion Factors for Logs | 01/01/1984 | TR-V-06-03 | web_TN-V6-3 (1.24 Mb) |
Excavators in Forest Roading Operations | 01/01/1984 | TR-V-06-04 | web_TN-V6-4 (824.47 Kb) |
Washington 88 Skyline Hauler | 01/01/1984 | TR-V-06-05 | web_TN-V6-5 (750.19 Kb) |
The Logger’s Back- A Physiotherapists Impression | 01/01/1984 | TR-V-06-09 | web_TN-V6-9 (746.53 Kb) |
Finance for Contractors- A Bankers View | 01/01/1984 | TR-V-06-12 | web_TN-V6-12 (227.28 Kb) |
Automatic Releasing Chokers | 01/01/1985 | TR-V-07-01 | web_TN-V7-1 (894.25 Kb) |
Clambunk Skidder Applications | 01/01/1985 | TR-V-07-02 | web_TN-V7-2 (971.24 Kb) |
Modelling and testing Two-Stump Anchors | 01/01/1985 | TR-V-07-04 | web_TN-V7-4 (257.84 Kb) |
The Logquip Smart Arch for Small Crawler Tractors | 01/01/1986 | TR-V-08-03 | web_TN-V8-3 (1.10 Mb) |
Surfacing of Steep Low Volume Roads | 01/01/1986 | TR-V-08-06 | web_TN-V8-6 (945.71 Kb) |
Mechanised Pine Felling and Delimbering | 01/01/1986 | TR-V-08-08 | web_TN-V8-8 (1.96 Mb) |