Documents

All documents
Report Name Published Report Download
Madill 171 Hauler01/01/1989V-14-14web_REP-V14-14-1989 (1.22 Mb)
TMY 70 Thunderbird Hauler01/01/1989V-14-13web_REP-V14-13-1989 (1.36 Mb)
Folding Barley Bridge Trailers in New Zealand01/01/1989V-14-11web_REP-V14-11-1989 (1.37 Mb)
The Denis Stroke Delimbing in Radiata Windthrow01/01/1989V-14-10web_REP-V14-10-1989 (933.05 Kb)
Felling Techniques to Reduce Butt Damage01/01/1989V-14-09web_REP-V14-9-1989 (1.36 Mb)
Skidder Cab Design and Operator Posture01/01/1989V-14-08web_REP-V14-8-1989 (406.31 Kb)
Analysis of Lost Time Accidents- 198801/01/1989V-14-06web_REP-V14-6-1989 (852.42 Kb)
Mechanised Processing and Extraction of Shortwood Thinning01/01/1989V-14-05web_REP-V14-5-1989 (1.51 Mb)
The Effect of Improved Working Conditions for Chainsaw Operators in Windthrow01/01/1989V-14-03web_REP-V14-3-1989 (1.30 Mb)
Production of Trials with a Wide Tyred Skidder01/01/1989V-14-02web_REP-V14-2-1989 (1.52 Mb)
Forwarder Operations in Australia01/01/1988V-13-27web_REP-V13-27-1988 (1.41 Mb)
The Bell Logger- Bunching Productivity Behind Mechanised and Motor Manual Systems01/01/1988V-13-25web_REP-V13-25-1988 (1.14 Mb)
Absenteeism in the Logging Industry (A Pilot Study)01/01/1988V-13-24web_REP-V13-24-1988 (444.03 Kb)
Log Truck Cost Estimates01/01/1988V-13-23web_REP-V13-23-1988 (365.34 Kb)
Diesel Engine Lubrication01/01/1988V-13-21web_REP-V13-21-1988 (1.11 Mb)
Analysis of Fatal Logging Accidents 1968-198701/01/1988V-13-20web_REP-V13-20-1988 (2.47 Mb)
The Liebherr 731C Crawler Tractor in Logging01/01/1988V-13-19web_REP-V13-19-1988 (1.04 Mb)
An Introduction to Network Analysis01/01/1988V-13-18web_REP-V13-18-1988 (1.45 Mb)
Otago/Southland Logging Workforce Survey01/01/1988V-13-17web_REP-V13-17-1988 (1.77 Mb)
Training and Awareness in the Logging Industry01/01/1988V-13-16web_REP-V13-16-1988 (1.38 Mb)
Otago/Southland Logging Workforce Survey01/01/1988V-13-14web_REP-V13-14-1988 (1.18 Mb)
Logging Operations on Restricted Landings (USA)01/01/1988V-13-13web_REP-V13-13-1988 (903.74 Kb)
Evaluation of the Waratah Processor in Radiata Thinnings01/01/1988V-13-12web_REP-V13-12-1988 (1.39 Mb)
Turnover in Logging01/01/1988V-13-09web_REP-V13-9-1988 (1.25 Mb)
Truck Tyre Pressures Effects on Truck and Road01/01/1988V-13-08 web_REP-V13-8-1988 (1.03 Mb)
The Bell Super-T Feller Buncher01/01/1988V-13-07web_REP-V13-7-1988 (1.37 Mb)
Multiple Log Sorting with a Hydraulic Knuckleboom Loader01/01/1988V-13-05web_REP-V13-5-1988 (1.25 Mb)
Analysis of Lost Time Accidents 198701/01/1988V-13-04web_REP-V13-4-1988 (1.49 Mb)
Job Satisfaction Among New Zealand Logging Workers01/01/1988V-13-03web_REP-V13-3-1988 (1.46 Mb)
A Comparison of a Grapple and a Cable Skidder on Easy Terrain01/01/1987V-12-13web_REP-V12-13-1987 (1.79 Mb)
A Cable Hauling Trial with the Madill 071- Using Three Different Rigging Systems01/01/1987V-12-11web_REP-V12-11-1987 (1.71 Mb)
Pulling Manrope with a Portable Winch01/01/1987V-12-10web_REP-V12-10-1987 (908.38 Kb)
“Hire Purchase Repayments, Tax and the Cash flow”01/01/1987V-12-09web_REP-V12-9-1987 (808.55 Kb)
Tracking for Skidder Extraction on Flat Country01/01/1987V-12-06web_REP-V12-6-1987 (1.29 Mb)
Labour Turnover on Logging01/01/1987V-12-05web_REP-V12-5-1987 (856.28 Kb)
Analysis of Lost Time Accidents- 198601/01/1987V-12-04web_REP-V12-4-1987 (972.23 Kb)
The Physiological Cost of Work- An Ergonomics Approach01/01/1987V-11-09web_REP-V11-9-1986 (932.97 Kb)
Mechanised felling with a Bell Logger01/01/1987V-11-08web_REP-V11-8-1986 (961.61 Kb)
Polyester Roundslings as Strops01/01/1986V-11-04web_REP-V11-4-1986 (1.02 Mb)
Average Yarding Distance01/01/1986V-11-01web_REP-V11-1-1986 (861.17 Kb)
Radiata Branch Characteristics and Delimbing Forces01/01/1985V-10-04web_REP-V10-4-1985 (722.07 Kb)
Lift Resistance of Stumps01/01/1985V-10-03web_REP-V10-3-1985 (223.32 Kb)
Computers for Log Transport01/01/1985V-10-02web_REP-V10-2-1985 (250.88 Kb)
Mechanised Delimbering- Can it Cut Costs?01/01/1984V-09-09web_REP-V9-9-1984 (265.89 Kb)
Mechanised Processing in Conjunction with a Cable Hauler01/01/1984V-09-07web_REP-V9-7-1984 (753.97 Kb)
PFV Wire Rope Trials01/01/1984V-09-06web_REP-V9-6-1984 (726.46 Kb)
Smallwood Handling with the Bell Logger01/01/1984V-09-05web_REP-V9-5-1984 (2.53 Mb)
Pre-Bunching in Thinnings01/01/1984V-09-03web_REP-V9-3-1984 (825.31 Kb)
Organised Felling for Thinning Radiata01/01/1983V-08-12web_REP-V8-12-1983 (931.05 Kb)
Lira Test Tri-Raker Anti-Kickback Chain01/01/1983V-08-11web_REP-V8-11-1983 (836.35 Kb)
Top