LIRO Reports – Harvesting

Below is a list of the documents in this folder

Report Name Published Report Download
Benefits of Remote Tension Monitoring01/01/1993V-18-23web_REP-V18-23-1993 (2.28 Mb)
Bellis BE85- Machinery Evaluation01/01/1995V-20-24web_REP-V20-24-1995 (824.06 Kb)
Bellis BE85 Cable Hauler01/01/1997V-22-20web_REP-V22-20-1997 (550.36 Kb)
Bellis BE60 Slackline Hauler01/01/1998V-23-01web_REP-V23-1-1998 (480.84 Kb)
Bell Logger Extraction in Thinnings01/01/1985 V-10-06web_REP-V10-6-1985 (675.83 Kb)
Battery Culvert Crossings for Logging Roads01/01/1984 TR-V-06-10web_TN-V6-10 (617.24 Kb)
Back to Basics: Better ways to Manage Your Back to Reduce Injury01/01/1999V-24-01web_REP-V24-1-1999 (1.16 Mb)
Aztec’s Safer Strategy for Log Truck Transport01/01/1999 TN-52web_TN-52 (278.31 Kb)
Axle Space and Road Wear01/01/1979 V-04-08web_REP-V4-8-1979 (774.42 Kb)
Average Yarding Distance01/01/1986V-11-01web_REP-V11-1-1986 (861.17 Kb)
Auxiliary Hydraulic Winches01/01/1983 TR-V-05-03web_TN-V5-3 (684.19 Kb)
Automatic Releasing Chokers01/01/1985TR-V-07-01web_TN-V7-1 (894.25 Kb)
Auto-Tensioning Load Restraints01/01/1998 TN-39web_TN-39 (334.81 Kb)
Attracting and retaining a Skilled Workforce01/03/2000V-25-03web_REP-V25-3-2000 (1.15 Mb)
Attitudes Towards Protective Eyewear in the New Zealand Logging Industry 199701/01/1997V-22-12web_REP-V22-12-1997 (2.04 Mb)
Analysis of Lost Time Injuries- 199701/01/1998V-23-15web_REP-V23-15-1998 (1.58 Mb)
Analysis of Lost Time Injuries 199814/01/1999V-24-14web_REP-V24-14-1999 (1.26 Mb)
Analysis of Lost Time Injuries 199601/01/1997V-22-19web_REP-V22-19-1997 (1.24 Mb)
Analysis of Lost Time Accidents- 199501/01/1996V-21-21web_REP-V21-21-1996 (1.05 Mb)
Analysis of Lost Time Accidents- 199401/01/1995V-20-11web_REP-V20-11-1995 (1.05 Mb)
Top